Cameron Flow Control Technology (UK) Ltd. International House, Willie Snaithe Road, Newmarket CB8

About This Project

We were approached by Knight Frank and asked to price a dilapidation claim, which included removing 400 square metres of mezzanine floor along with a large amount of pallet racking. The floor then needed to be made good, strip out office portioning, remove a large, galvanised steel building, and repair cladding to the roof. Stripped out all the comms, 8 x 2 tonne cranes and a specialist test bay.

From the original landlords claim, it later transpired that we saved the client in excess £100,000.00, the rest of the works were cash settled by the tenant. All completed within a very tight time scale. Email received after completion from the Operations Director.

Great job Andrew. The timescale you carried the work out in has been terrific. 

Thanks Frankie

0/5 (0 Reviews)